no image

caltrans lane closure charts

The Code of Federal Regulations, Title 23, Section 630, Subpart J, Work Zone Safety and Mobility, (23 CFR 630 Subpart J) requires Caltrans to adopt a policy that implements TMPs on all federally funded highway projects. They require lane closure charts that specify when and how many lanes may be closed for construction. Capital projectsif insufficient funds are available in both supplemental work funds and contingency funds, propose a fund request. caltrans. Obliterated traffic stripes and markings should not be visible to drivers as pavement delineation during the day, at night, and under all weather conditions. Verify the district traffic manager reviews a closure request for conflicts before approving it. Verify the channelizers post is predominantly orange. If the contractor requests modifications to the contract traffic control plans, refer them to Section 7-1.04, Public Safety, of the. Verify that temporary traffic stripe tape for use more than 14 days is applied according to the specifications, and temporary traffic stripe tape to remain in use 14 days or less is applied according to the manufacturers instructions. Verify the proper types of flashing arrow signs are used. Require the contractor to set up an off-the-highway detour before closing all ramps in both directions of travel at the same interchange. Verify that the weight of the attenuator and the weight of the support truck are within the specified limits as shown on the Authorized Material List for Highway Safety Features. The LCS will generate email notifications to the resident engineer and the district traffic manager when the contractor cancels a closure. Work zone activities can disrupt the publics mobility and access. Establish reduced regulatory speed limits in accordance with procedures in the. Verify temporary flashing beacon systems are relocated as work progresses according to the specifications. Review the contractors work plan for compliance with the requirements in Section 12-4.04, Temporary Pedestrian Access Routes, of the Standard Specifications. Verify attendance of subcontractors and other contractors personnel involved with traffic control. Verify that the contractor is prepared to comply with TMPs related to work performance. Changes to any of these plans may alter the need for temporary crash cushion modules. Confirm the contractors employee uses the assigned user identification to submit the closure requests in the Lane Closure System (LCS). Provide the contractor with the internet link to access the LCS web-based training. Prohibit the use of traffic cones that have been damaged or coated with asphalt or other substances that prevent the cones from functioning as intended. Depending on the complexity of the work or the magnitude of anticipated effects, a TMP may provide closure charts, standard special provisions for maintaining traffic, traffic control plans, andfor major projectsa separate comprehensive report. Caltrans can enforce contractor compliance with closure pickup deadlines in two ways: Caltrans can order a contractor to pick up a closure early if traffic delays become significant because of a project incident or activities outside the project area. Verify the signs are properly aimed at approaching traffic. Advisory speeds are not enforceable by the CHP. Unless the contractor can provide a reasonably safe route that does not involve crossing the roadway, use appropriate advance signing to direct pedestrians to cross to the opposite side of the roadway. Design for the speed that vehicles will travel. The cost estimate used in the plans, specifications, and estimate is based on the expected number of events needing COZEEP identified during project development. Complete training in one sitting. Automated flagger assistance devices (AFAD) can be used in place of flagger to remove workers from the roadway to improve worker safety from traffic. Scheduled Dates: 06/13/2022 to 01/16/2023. Operation work schedule with a timeline set at 20-minute intervals. Closures not needed on the authorized date are 10-22 within 2 hours after the authorized start time. Create a Requestor LCS account and set the option in the account to status closures for those who will request and status closures. Basic instructions usually apply more to the planning and design phase of a project, but they also help provide construction personnel with basic concepts for safe and efficient traffic flow through a highway construction project. All contract plans and special provisions must include a traffic control plan, which may include T Series Standard Plans, detour plans, or motorist information plans. Withhold some payment from progress pay estimates to cover the cost of removing Type K temporary railing. Avoid traffic splits if possible. Economy will be a factor only as necessary to obtain balance between benefits and resources. Acts as a resource for the resident engineer, the DTM, and the TMP manager during TMP implementation. Maintaining such closures is a full-time assignment, and the assigned worker should have no other duty. For public safety, when flaggers are not shown on the plans or specified and when ordered by the engineer, providing flaggers is change order work for which Caltrans pays 100 percent. Reported closures to include freeway mainline, local roads, and interchange ramps. Inform the Transportation Permits Unit 15 days in advance of the closure. Shift traffic to one side or the other, but do not split it into two traffic streams. Verify the planned temporary signal system includes a backup power source and automatic transfer switches. Section 7-1.04, Public Safety, requires that the contractor provide for the safety of the public during construction. Evaluate the COZEEP use criteria for complete highway closures and nighttime closures of one or more lanes on multilane highways. Require the contractor to anchor bases of traffic cones that do not have enough size and weight to keep the cones in an upright position. Critical stage for each operation when the alternative or additional equipment, materials, or workers must be activated. Directs the termination or modification of active planned lane closure operations when traffic delays become significant, without compromising traveler or worker safety. Use the following criteria and risk factors to determine when COZEEP is needed on a project. Verify barricade construction complies with Section 12-3.10, Barricades, of the Standard Specifications and sheet A73C, "Delineators, Channelizers, and Barricades," of the Standard Plans. Providing for exit ramp traffic within the coned-off area may be difficult. All traffic control devices should conform to Section 12, Temporary Traffic Control, of the Standard Specifications. Verify portable radar speed feedback sign systems comply with the requirements in Section 12-3.37 Portable Radar Speed Feedback Sign Systems of the Standard Specifications. Similarly, certain striping operations require the operator to operate against live traffic because of clearances. Use of 180-day temporary pavement markers on an open-graded surface is not advised; when removed, the marker glue can peel up the open grade. Traffic control devices, equipment, and other construction materials and features should not protrude into the usable width of the sidewalk, temporary pathway, or other pedestrian facility. Verify that the impact attenuator vehicle complies with all specification requirements. Make safety and convenience the primary design considerations. Work with the DTM to verify that project activities conform to the TMP, contingency plans are implemented when necessary, and disruption to the traveling public is minimized and does not exceed limits established in the TMP. This will be paid under a contract bid item. Daytime ramp closures do not usually need COZEEP. An inevitable degree of mismatch between the old and new surfaces creates a slight discontinuity that may cause a car to lurch or swerve. The resident engineer must email service requests, daily reports, cancellation forms, and tracking spreadsheets to the COZEEP coordinator on a monthly basis. Strategies that may result in a net reduction of overall delay for motorists include full facility closures, extended weekend closures, continuous weekday closures, A+B contract specifications, and performance-based, traffic-handling specifications. Keep pedestrian facilities clear of obstructions. Refer to Section 7-1.04, Public Safety, of the. Workers may operate vehicles opposite the flow of traffic inside a closed lane only with the prior authorization of the resident engineer. If the contractors activities interfere with vehicular or pedestrian traffic, contact the contractor and request correction of the deficiency. Refer to Section 7-1.04, Public Safety, of the Standard Specifications, and Topic 902, Sight Distance and Clear Recovery Zone Standards, of the Highway Design Manual. The contract item price also includes the costs of work necessary to restore channelizers damaged by public traffic. Coordinate with the district public information office to provide the public with information on planned project road closures, new road openings, traffic rerouting, and changes in traffic conditions. Verify the contractor installs the temporary no-passing zone signs if no-passing centerline pavement delineation is obliterated. Be aware that reductions in the width or number of lanes affect the capacity and flow of traffic. If the equipment is not available, make other arrangements as soon as possible. Obtain from the contractor, the completed Form CEM-2311, Temporary Pedestrian Access Route Contractor Compliance Report, within 2 business days after construction of a temporary pedestrian access route. As a last resort, the state representative has authority to stop the contractors operation, wholly or in part, or take appropriate action when public safety is jeopardized. The statewide agreement requires that cancellations be made during normal working hours and at least 24 hours before the time that the CHP is to arrive on the project. Refer to Section 4-1203B (14), Portable Changeable Message Signs, of this manual. You may submit a single task order to cover more than 1 day. During the preconstruction conference, discuss: https://dot.ca.gov/programs/construction/forms. Verify the contractor cements the bases of channelizers used for temporary edge line delineation as specified. During construction, district construction directs the implementation of TMP elements that are part of the contract or encroachment permit. Require ballast for drums according to manufacturer specifications. Verify temporary pavement markers comply with Section 81-3, Pavement Markers, of the Standard Specifications, except for the waiting period before placing pavement markers on new asphalt concrete. Night construction activities, such as replacing pavement slab, replacing bridge joint seals, and replacing pavement markers, that can create an unexpected condition for driverseven those familiar with the highway. Verify the required signs are placed during the cleaning and painting activities and removed at the end of each work shift. ROAD TYPE DISTANCE BETWEEN SIGNS A B C RURAL EXPRESSWAY / FREEWAY 100 350 500 1000 350 500 350 500 1500 2640 For speed of 45 mph or more, L = WS For speed of 40 mph or less, L = WS/60 * - For other offsets, use the following merging taper length formula for L: * URBAN - 25 mph OR LESS URBAN - MORE THAN 25 mph TO 40 mph URBAN - MORE THAN 40 . The Department has standardized its road and lane closure reporting into a statewide Lane Closure System (LCS). Confirm the signs display only pre-approved messages and that the messages conform to the Changeable Message Sign Guidelines, and district and Caltrans policy. The project engineer should consult with the resident engineer to determine which specific construction operations should use COZEEP and use that as the basis of the initial funding. Verify the contractor provides overhead covering, overhead lighting, or both when required. Contact the district traffic manager for assistance with either of these tasks. Before opening a roadway to unrestricted public traffic, the final delineation must be in place on the roadway either by using long-term or short-term temporary delineation or channelizing devices. Provide protective overhead covering as necessary to protect from falling objects and dripping from overhead structures. File formats include CSV, JSON, TXT and XML. The CHP has 5 working days to notify Caltrans if the actual travel time, mileage, or both, are greater than the allowances estimated on the daily report. Critical pieces of equipment are those necessary to complete the planned work in the closure, for which no close onsite substitutes exist, and whichif rendered inoperativewould extend the closure beyond the time allowed in the closure charts. At no time should a U-turn be permitted in traffic. Process change orders for bid items that require traffic control that are not caused by an ordered change for a contract item or items. Consider use of changeable message signs in advance of the work, in addition to the signs and warning devices shown on the plans for traffic control systems. Information such as lane closure charts and road user costs will be added to the TMP once the project moves into the . Pay special attention to the aiming of the sign whenever solar-powered signs are used. Tweets by @caltransdist6. If automated flagger assistance devices (AFAD) bid item is not shown on the bid item list, providing AFAD is change order work. In urban and suburban areas with high vehicular traffic volumes, place the signs at intersections. Verify that the contractor has all components on hand before setting up any traffic control system and that all components meet the specifications requirements. Do not allow the application of temporary pavement delineation over existing pavement delineation. During the project initiation or planning stage, Caltrans considers TMP measures with associated road user costs and additional construction costs to the fullest extent feasible. The following are some possible installation procedures that may be used by the contractor, depending on the situation in which the system will be used: After installation and when the inspector is available, make a drive-through inspection of the system. San Bernardino County Transportation Authority (SBCTA) Please visit SR 210 Base Line Project's website for the latest news regarding the 210 freeway construction. Use tangent diagonal crossing in preference to reversing curves. For public convenience, such as routing traffic through detours when not shown on the plans and when ordered by the engineer, providing flaggers is change order work for which Caltrans pays 100 percent. Review the project plans and sheets T1A, T1B, and T2 of the Standard Plans. Compensation for flaggers used for all movements of workers, construction vehicles, and equipment on or across lanes open to traffic will be included in the bid item of work involved. Provide the contractor with the message content and the thresholds used for triggering when the messages will be displayed. Links: Discuss the contingency plan at the project partnering or preconstruction meeting. Document why an item does not comply with the ADA checklist in Category 46, Assistant Resident Engineers Daily Reports, of the project records. Verify the contractor removes traffic-handling equipment and devices from the job site when they are no longer needed for controlling traffic. Review the requests to avoid oversights and overbooking. If it becomes necessary to cancel the work, call the local CHP contact person listed in Part 4 of the task order as soon as possible. 07/23/2020 State Route 210 Base Line Update (PDF) Agendas & Minutes. Review Sections 12-4.04, Temporary Pedestrian Access Routes, and 16-2.02, Temporary Pedestrian Facilities, of the Standard Specifications for the temporary pedestrian facilities requirements. View from List View from Map One Stop Shop Traveler Information link for Western US states: California, Oregon, Nevada and Washington. Message Signs Stationary closures on a traffic lane are 10-97 before placing the first cone on the traffic lane, and 10-98 after removing all the cones from the traffic lane. Motorists who are forewarned of construction conditions may be more tolerant of delay and inconvenience and probably will be more alert and responsive to work zone traffic control. Lane closure lasting 7 hours on Toll Bridge for Bridge Construction affecting #1, #2, #3 lane(s) in District: 4 From: SFOBB Pier 1 (W-1) San Francisco to EB On from YBI Hillcrest Road San Francisco View on Google Maps ID: C80JA-0004-2023-03-07-23:01:00 Perform additional reviews periodically throughout the construction project, since changes may affect the facilitys effectiveness. These instances do not require formally approved plans. Caltrans contracts, procedures, and guidelines form the basis for traffic-control measures throughout its construction projects and establish a baseline for operations statewide. Do not hide the taper of a traffic control system behind a vertical or horizontal curve. Check Current Highway Conditions Enter Highway Number(s) You can also call 1-800-427-7623 for current highway conditions. During the term of the contract, the CHP may increase or decrease the rates shown in the contract by notifying the Caltrans statewide contract managers, who will notify the district coordinators. Temporary full freeway closures of all lanes in the same direction of travel. Verify Type K temporary railing is placed on a firm, stable foundation uniformly graded throughout the entire length of the railing. . Verify the lights are dimmed at night and set on bright during daylight hours. Next install the first sign drivers will see in approaching the work area from the affected direction. The CHP memorandum of understanding requires a minimum payment of 4 hours per officer. Consult with the district traffic manager for assistance with these items. Chapter 1 - Caltrans Construction Organization, 4-1202B Temporary Traffic Control Devices, 4-1202B (10) Temporary Crash Cushion Module, 4-1202B (14) Portable Changeable Message Signs, 4-1202B (16) Temporary Flashing Beacon Systems, 4-1202B (17) Automated Work Zone Information Systems, 4-1202B (18) Portable Transverse Rumble Strips, 4-1202B (19) Portable Radar Speed Feedback Sign Systems, 4-1202B (20) Automated Flagger Assistance Devices, 4-1202B (21) Temporary Automated End of Queue Warning System, 4-1202C (2)Temporary Pedestrian Access Routes, 4-1202C (3) Bridge Cleaning and Painting Activities, 4-1203B Temporary Traffic Control Devices, 4-1203B (10) Temporary Crash Cushion Module, 4-1203B (14) Portable Changeable Message Signs, 4-1203B (16) Temporary Flashing Beacon Systems, 4-1203B (17) Automated Work Zone Information Systems, 4-1203B (18) Portable Transverse Rumble Strips, 4-1203B (19) Portable Radar Speed Feedback Sign Systems, 4-1203B (20) Automated Flagger Assistance Devices, 4-1203B (21) Temporary Automated End of Queue Warning System, 4-1203C (1b) Contingency Plans for Closures, 4-1203C (1d) Status Updates for Authorized Closures, 4-1203C (1f) Placement Sequence and the Start of Work, 4-1203C (1i) Reverse Operations Inside Closures, 4-1203C (2)Temporary Pedestrian Access Routes, 4-1203C (3) Bridge Cleaning and Painting Activities, 4-1203D (3) Temporary Lane Line and Center Delineation, 4-1203D (4) Temporary Edge Line Delineation, 4-1203D (5) Temporary Traffic Stripe Tape, 4-1203D (6) Temporary Traffic Stripe Paint, 4-1203D (7) Temporary Pavement Marking Tape, 4-1203D (8) Temporary Pavement Marking Paint, 4-1203E Temporary Pavement Delineation for Seal Coats, 4-1206B Temporary Traffic Control Devices, 4-1206B (9) Temporary Crash Cushion Modules, 4-1206B (13) Portable Changeable Message Signs, 4-1206B (15) Temporary Flashing Beacon Systems, 4-1206B (16) Automated Work Zone Information Systems, 4-1206B (17) Portable Transverse Rumble Strips, 4-1206B (18) Portable Radar Speed Feedback Sign Systems, 4-1206B (19) Automated Flagger Assistance Devices, 4-1206B (20) Temporary Automated End of Queue Warning System, 4-1202 B (14) Portable Changeable Message Signs, 4-1202C (2) Temporary Pedestrian Access Routes, 4-1203C (2) Temporary Pedestrian Access Routes, CalOES: Power Outage and Fire Recovery Resources. Note any unusual local traffic patterns and scheduled special events during the life of the contract. Maintain railings and walkways in good condition. When an operation is terminated before the time the specifications allow because of circumstances beyond the contractors control, consider granting time, compensation, or both, within the terms of the contract. A maintaining traffic standard special provision allows assessing the contractor a contract payment deduction for the value of a traffic delay when the contractor exceeds the closure window. Call on Caltrans work forces only because of a physical inability of the contractor or a refusal by the contractor to act. Evaluate the COZEEP use criteria for lane closures on freeway-to-freeway connectors and for night closures of exit and entrance ramps. Visit Quickmap@dot.ca.gov for latest road info. Verify temporary or permanent pavement delineation is in place before opening the traveled way to traffic. The California MUTCD Part 6 contains figures that can be adapted for traffic-handling plans. The California Highway Patrol. The traffic control plan should be appropriate for anticipated conditions that may occur during construction. Confirm the contractor submits a schedule of planned closures in advance as required by Section 12-4.02A(3), Submittals, of the Standard Specifications. Confirm that AFAD are placed in accordance with the plans and where clearly visible to the AFAD operator and to approaching traffic. During the inspection, drive through the system as though you had no knowledge of the work zone. Avoid placing entering transitions on or just beyond horizontal curves or the crest of a summit vertical. Mobile Reviewing the TMP and traffic contingency plan for constructability issues. Temporary traffic control devices are divided into categories: The condition of temporary traffic control devices should comply with the most current edition of the American Traffic Safety Services Association (ATSSA) publication Quality Guidelines for Temporary Traffic Control Devices and Features. California Department of Transportation (Caltrans) Colorado Department of Transportation (CDOT), Region 1 and Region 6 Indiana Department of Transportation (INDOT) . When an AFAD becomes inoperable, notify the contractor to immediately replace it with an identical device, use a flagger with the appropriate-size advance warning sign and gate cones as shown in Standard Plan T13 or stop all construction activities that require the device to be in operation. Impact attenuator vehicles are paid for as part of the contract item for the traffic control system. Samples of activities that may require a contingency plan: A construction contingency plan describes: The contractor verifies or updates the contingency plan at the same time as submitting the written schedule of planned closures. The resident engineer must track COZEEP hours used and estimate expenditures each month. The following guidelines are for measuring and paying for various traffic control devices for construction areas. When portable signal systems are used in forests or grasslands, confirm adherence to all fire safety requirements. Obtain a sample of the type of portable delineator to be used on the project. Emergency closures can be searched under Statewide. Verify the contractor uses an impact attenuator vehicle as a shadow vehicle in moving closures and during placement and removal of components in stationary closures. Please use an alternate route. Review the closure requests for compliance with the closure requirements charts and other contract requirements. Acts as the single focal point for all traffic decisions resulting from planned activities on the State Highway System. This will speed the placing of closures and allow for a more consistent taper alignment. Make sure that portable transverse rumble strips are placed before closing the lane to traffic. Verify that covers placed on sign panels completely block out any messages so that the messages cannot be seen day or night. CalTrans Lane & Road Closures SR-38 East / West Active Thu Mar 2 2023, 6:01AM Lasting 14 hours One-Way Traffic closure lasting 14 hours on Conventional Hwy for Emergency Work affecting #1, Right Shoulder lane (s) in District: 8 From: Old Mill Creek Rd Mentone to Jenks Lake Rd Angelus Oaks View on Google Maps ID: C38EA-0004-2023-03-02-06:01:52 Verify the contractor notifies and cooperates with local authorities wherever the local authorities regulate traffic. Examples of unacceptable messages include Drive carefully, Have a Nice Day, and Thank you.. Confirm the intended vehicle path is clearly visible. Moving closures are 10-97 before the actual start time of the closure, and 10-98 after the actual end time of the closure. For current road conditions call 1-800-427-7623. Do not allow the use of a damaged impact attenuator vehicle. Confirm flaggers are wearing American National Standards Institute (ANSI)-compliant garments in accordance with the Construction Safety Orders of the California Department of Industrial Relations, or the prime contractors or subcontractors Injury and Illness Prevention Program or Code of Safe Practices, whichever is more stringent. Lane Closures Emergency closures can be searched under District or Statewide. Rural locations with a high volume of truck traffic, steep downgrades, or both. Consider how the shape and the light versus the shadow of falsework openings will appear in daytime and at night. Make every effort to resolve disputes at the lowest level such as between the resident engineer and the CHP coordinator at the local CHP area office. If this equality is not possible, confirm that the design speed differential is no more than 10 mph. Do not allow the use of power from private parties to power the temporary signal system. Verify that the trailer bearing the sign can be leveled and that the sign operates within the required minimum and maximum heights. For continuous construction work zone speed limit reduction, verify that advisory warning signs are posted to alert motorist of the roadway condition as specified and as shown on the standard plans. Significant traffic effectan individual traffic delay of 30 minutes or more above normal travel time during recurring congestion on the existing facility. The California MUTCD Sign Charts contain commonly used signs in California, and is not meant to be used as a comprehensive or stand-alone design tool. Caltrans lane closure charts jackett animecrickett 22 scope Lane closure charts will show the number of lanes required during different hours of the day. Do not allow the contractor to mix different types of temporary traffic control devices on the same alignment. To expedite the work, it is helpful to close the exit temporarily if the contract, traffic patterns, and volumes permit. Routinely inspect temporary pedestrian facilities for compliance. Refer to Section 12-4.02C(10), End of Queue Monitoring and Warning With Truck Mounted Changeable Message Sign, of the revised, Multiple closures and inter-project coordinationAvoid multiple closures with overlapping sign patterns. The district will establish a procedure for preparation, review, and approval of changes related to roadway construction and detour plans that include traffic control devices. If a contractor is unable to access the LCS Mobile web page, obtain the closure status from the contractor and notify the transportation management center. Check for live traffic conditions. Time and mileage are based on officers starting and stopping times at their reporting station and include travel to and from the project. TMP strategies are designed to maintain additional delays below this maximum threshold, that is, less than 15 or 20 minutes. If sight distance is not adequate, contact the district traffic engineer for suggestions or recommendations. Portable delineators are paid for as part of the contract item for the traffic control system. If the opening has a drop off behind it that might present a hazard to the public, document in the resident engineers daily report an exception to the Standard Plans note and have the contractor close the gap for public safety purposes.

Tech Company Valuation Multiples 2022, Mv Thomas Aquinas Bodies, Articles C